![]() They will be fascia panel mounted with multiple panel/switches for the same turnout in some instances. I want them controlled with the same pt# momentary contact push button switches I used for the lighting setup. Starting with the very first section I will need to mount and make functional the Tortoise turnout machines. This means all electrical and mechanical components must be mounted and working. Each module will be entirely complete before being placed on the layout. For regular readers of the LK&O blog you know the plan is to build each track “section” on the workbench for transfer to the benchwork once complete. While I cut the final pieces of sub-roadbed I am thinking through the next phase to come – track laying. There is a follow-up to this post that describes further refinements made to the Tortoise control.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |